Preston Pipelines brings their private works attitude of cooperation and problem solving to the highly technical world of complex public works projects. Agencies and municipalities welcome our approach with letters of recommendation for future work (please ask us for copies and contacts!)

PIPELINE PROJECTS
The P565 Distribution System Project for the Semi Tropic Water Storage District in Wasco California was a $15 million dollar project for Preston Pipelines. This project was immediately followed by a $2 million dollar WB216 Improvement project.

The work included almost 16,000 lineal feet of 48”-66” RCP installation. As well, a central pumping plant location included forming and pouring the concrete sumps at the water intake, with all trash racks, hand railing, and catwalks. 5 Vertical turbine pumps were installed, along with 36”, 48” and 54” flow meters, motor control units, and all electrical facilities. 51’ tall and 75’ tall welded steel tanks were constructed, and epoxy coated welded steel header piping and valving at end user turnouts.

MUNICIPAL FACILITIES
Preston recently completed the $1 million Pavilion Station Water Storage Tank, Pump Station, and Motor Control Center for San Jose Water Company. This project entailed the construction of a 98,800 gallon steel tank, a 500 GPM Pump Station, all grading and paving activities, fencing, retaining walls, drainage, electrical, lighting, and the construction of the pump house.

The project was complicated by site space restrictions and the shared approach to the adjacent Fire Station facility requiring unobstructed access.